NEW QUESTION 46
If you use floats to limit dispatching in capacity planning, what type of time element can be reduced by strategy settings while dispatching?
- A. Minimum wait time
- B. Production time
- C. Goods receipt processing time
- D. Queue time
Answer: D
NEW QUESTION 47
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?
- A. Planning with final assembly (40)
- B. Make-to-stock production (10)
- C. Make-to-order production (20)
- D. Planning without final assembly (50)
Answer: A
NEW QUESTION 48
How can you limit the number of master data objects to be created when the manufacturing process is the same for many different products?
Please choose the correct answer.
Response:
- A. By creating routings with alternative sequences
- B. By assigning different materials to the same routing
- C. By assigning the same production version to different materials
- D. By creating routings with parallel sequences
Answer: B
NEW QUESTION 49
What does it mean for the production planner when MRP works with infinite capacities?
- A. MRP creates capacity requirements only if the work center has sufficient capacity.
- B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
- C. MRP creates capacity requirements without checking the capacity of a work center.
- D. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
Answer: C
NEW QUESTION 50
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?
- A. Manual planning without check
- B. Consumption-based planning
- C. Forecast planning
- D. Material requirements planning
Answer: B
NEW QUESTION 51
The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging?
Response:
- A. It enables the propagation of network alerts across the bill of materials structure
- B. It links receipts from an alternative location in case of a shortage in the default location
- C. It replaces fixed pegging relationships unless they have been created for stock
- D. It propagates changed sales order priorities to the pegged planned orders
Answer: B
NEW QUESTION 52
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.
- A. Adjust the available capacity.
- B. Reduce the planning window.
- C. Select an alternative mode on a resource.
- D. Form optimum sequences to reduce setup times.
- E. Execute a new production planning run.
Answer: A,C,D
NEW QUESTION 53
You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
- A. Planning without final assembly (50)
- B. Planning at assembly level (70)
- C. Make-to-order production (20)
- D. Planning with final assembly (40)
Answer: A
NEW QUESTION 54
The material master of your finished product contains MRP type "PD". You set a manual firming date in the stock requirements list. Which of the following will firm planned orders" There are 2 correct answers to this question.
Response:
- A. Assigning a production scheduling profile
- B. Setting a planning time fence in the Material Master Record
- C. Creating a planned order within the planning time fence
- D. Manually changing the quantity of a planned order
Answer: B,C
NEW QUESTION 55
Which process order function uses a resource network?
Please choose the correct answer.
Response:
- A. Resource selection
- B. Capacity planning
- C. Resource scheduling
- D. Capacity leveling
Answer: A
NEW QUESTION 56
Which SAP solutions are part of the Digital Value Network portfolio?
There are 3 correct answers to this question.
Response:
- A. Concur
- B. SAP Hybris
- C. SAP Fieldglass
- D. SAP Human Capital Management
- E. SAP Visual Enterprise
Answer: A,B,C
NEW QUESTION 57
What is the correct sequence of the following Activate methodology phases?
Please choose the correct answer.
Response:
- A. Prepare, Explore, Realize, Deploy
- B. Prepare, Realize, Iterate, Continuous Improvement
- C. Validate, Realize, Test , Deploy
- D. Prepare, Validate, Test, Go-Live
Answer: A
NEW QUESTION 58
For what production type are production orders used?
- A. Process manufacturing processes
- B. Period and quantity-oriented production
- C. Discrete manufacturing processes
- D. Replenishment controlled by control cycles
Answer: C
NEW QUESTION 59
In which data objects do you maintain the production line as the work center for repetitive manufacturing?
Note: There are 2 correct answers to this question.
- A. Production version
- B. Repetitive manufacturing profile
- C. Routing
- D. Production cost collector
Answer: A,C
NEW QUESTION 60
Which task list types can have parallel sequences?
There are 2 correct answers to this question.
Response:
- A. Master recipes (2)
- B. Reference operation sets (S)
- C. Rate routings (R)
- D. Routings (N)
Answer: C,D
NEW QUESTION 61
Which of the following is used by the MRP Live planning run in SAP S/4HANA?
Please choose the correct answer.
Response:
- A. Net change planning
- B. MRP list
- C. Parallel processing across servers
- D. Planning horizon
Answer: A
NEW QUESTION 62
In Make-to-order production, which field controls whether the components will be planned as sales order specific stock?
Please choose the correct answer.
Response:
- A. The Individual/Collective indicator of the component
- B. The item category of the component in the BOM
- C. The MRP Type of the component
- D. The Planning Strategy of the finished product
Answer: D
NEW QUESTION 63
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note: There are 2 correct answers to this question.
- A. In-house production time
- B. Total replenishment lead time
- C. Operation duration
- D. Planned delivery time
Answer: A,D
NEW QUESTION 64
What is the first step in the MRP run?
Please choose the correct answer.
Response:
- A. Source determination
- B. BOM explosion
- C. Lot size calculation
- D. Net requirements calculation
Answer: D
NEW QUESTION 65
......