NEW QUESTION 20
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. Run PP/DS heuristics for repetitive manufacturing.
- B. Run MRP with quota arrangement.
- C. Run MRP with automatic selection of production version.
- D. Assign planned orders manual lying the planning table.
Answer: A,B
NEW QUESTION 21
You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders?
There are 2 correct answers to this question.
Response:
- A. Work center
- B. Routing header
- C. Bill of material
- D. Material master
Answer: C,D
NEW QUESTION 22
What is the difference between co-products and by-products?
- A. Only co-products are identified by a special item category in the bill of material (BOM).
- B. Only co-products can be manufactured in isolation from the main product.
- C. Only by-products have a zero inventory valuation.
- D. Only co-products appear in the process or production order settlement rule.
Answer: D
NEW QUESTION 23
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?
- A. Use batch determination.
- B. Use the material where-used report.
- C. Use the material staging report.
- D. Use the batch information cockpit.
Answer: D
NEW QUESTION 24
For which data objects do you have to set up CIF integration models in S/4HANA to use them in advanced planning?
There are 2 correct answers to this question.
Response:
- A. Work center
- B. Material master
- C. Contract
- D. Production plant
Answer: C,D
NEW QUESTION 25
In the Manage Shortage view of the new SAP Fiori app "Monitor Material Coverage", what do the stars indicate?
Please choose the correct answer.
Response:
- A. The priority of the proposed solution
- B. The viability of the proposed solution
- C. The presence of firmed planned orders
Visit us athttp://examcertify.com/C_TS422_1909.html - D. The presence of production orders
Answer: B
NEW QUESTION 26
Which of the following business processes are controlled by parameters that are dependent on production order type? Note: There are 2 correct answers to this question.
- A. Implementation
- B. Planning
- C. Engineering change management
- D. Inspection during production
Answer: A,B
NEW QUESTION 27
At the end of the MRP run you receive the exception message "Reschedule In Operation". What caused the message to be generated?
Please choose the correct answer.
Response:
- A. The requirement no longer exists
- B. A firmed planned receipt cannot be rescheduled
- C. The requirements date occurs that of a firmed planned receipt
- D. The requirements date occurs before that of a firmed planned receipt
Answer: D
NEW QUESTION 28
What are properties of MRP Live?
There are 2 correct answers to this question.
Response:
- A. It is executed on the database server
- B. Data is read sequentially from the database tables
- C. The code is written in SQL Script
- D. It uses the same BAdis as classic MRP
Answer: A,C
NEW QUESTION 29
Which automotive-specific functionality is embedded in SAP S/4HANA?
There are 3 correct answers to this question.
Response:
- A. Packaging Logistics
- B. Equipment and Tools Management
- C. Enhanced characteristics based processes
- D. Parts interchangeability
- E. Enhanced Kanban Processing
Answer: A,D,E
NEW QUESTION 30
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
- B. The assigned routing must NOT have alternative sequences.
- C. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
- D. The lot size range must be within the lot-size range of the assigned routing.
- E. The assigned routing must be a rate routing.
Answer: A,C,D
NEW QUESTION 31
Which SAP solutions are part of the Digital Value Network portfolio?
There are 3 correct answers to this question.
Response:
- A. Concur
- B. SAP Hybris
- C. SAP Fieldglass
- D. SAP Human Capital Management
- E. SAP Visual Enterprise
Answer: A,B,C
NEW QUESTION 32
To ensure that the warehouse operator only stages large components in the exact required quality for each production order, which warehouse material staging method would you recommend?
Please choose the correct answer.
Response:
- A. Release order parts
- B. Pick parts
- C. Kanban
- D. Crate parts
Answer: B
NEW QUESTION 33
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? Note: There are
3 correct answers to this question.
- A. SAP Concur
- B. SAP Ariba
- C. SAP C/4HANA
- D. SAP Field glass
- E. SAP SuccessFactors
Answer: A,B,D
NEW QUESTION 34
When the goods receipt for a finished product is posted during confirmation on a manufacturing environment, which of the following actions are also performed by default?
There are 2 correct answers to this question.
Response:
- A. Staging of components for the next order in the sequence
- B. Posting of production costs to cost collector
- C. Reduction of the capacity requirements
- D. Archiving of backflush documents
Answer: B,D
NEW QUESTION 35
In which material master views can you select the batch management checkbox?
There are 2 correct answers to this question.
Response:
- A. Basic Data 1
- B. MRP 4
- C. Work Scheduling
- D. Purchasing
Answer: C,D
NEW QUESTION 36
What must be used in the system to plan the requirements for different subcontractors separately?
Response:
- A. Production versions
- B. Planning plant
- C. Storage locations
- D. MRP areas
Answer: D
NEW QUESTION 37
What are pillars of SAP Activate?
There are 2 correct answers to this question.
Response:
- A. SAP Best Practices
- B. SAP MaxAttention
- C. Premium engagement
- D. Guided Configuration
Answer: A,D
NEW QUESTION 38
A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR?
There are 2 correct answers to this question.
Response:
- A. Production scheduling profile
- B. Scheduling margin key
- C. Confirmation profile
- D. Operation control key
Answer: A,D
NEW QUESTION 39
Which functional capabilities does the Detailed Scheduling Board have?
There are 2 correct answers to this question.
Response:
- A. Enter time-ticket confirmation for production orders
- B. Change planned order quantities
- C. Undo for drag & Drop planning activities
- D. Change sales order quantities
Answer: B,C
NEW QUESTION 40
Which elements are included in the structure of the batch where-used list?
There are 3 correct answers to this question.
Response:
- A. Purchase orders
- B. Collective orders
- C. Stock transfers
- D. Transfers from batch to batch
- E. Planned orders
Answer: A,C,D
NEW QUESTION 41
......